Detection of supply lines on Steinefrenz construction site

steinefrenz scan

Part of renovation works/the necessary laying of new supply lines, including drinking water and a new power line across the site and to an existing building. Old cable plans were used as a basis for the project, but these turned out to be incorrect, so the route of all the cables had to be remapped using lines and area surveys.

"Pflicht" indicates required fields

This field is for validation purposes and should be left unchanged.
Wir verwenden Ihre Angaben zur Beantwortung Ihrer Anfrage. Weitere Informationen finden Sie in unseren Datenschutzhinweisen.

Volkmann Strassen-
und Verkehrstechnik GmbH

Hohe Straße 9-17
56410 Montabaur

Tel: +49 2602 9470 0
geo-bodenradar@volkmann-sv.de

WordPress Cookie Notice by Real Cookie Banner